Construction Delay Part III by calico_jester
Open full image in new tab Members remain the original copyright holder in all their materials here at Renderosity. Use of any of their material inconsistent with the terms and conditions set forth is prohibited and is considered an infringement of the copyrights of the respective holders unless specially stated otherwise.
No AI - This artwork was created entirely by hand or with traditional digital tools.
Description
... and then there is another side *
Kiss the Rain
I'm leaving now, but here is a reminder
'Twill bring to you the days we walked through rain
So when you wish to feel my hand in yours
Or stroke your dripping hair-- Then kiss the rain
Though leaving now, I wish I could be with you
So when you feel o'erwhelmed with grief or pain
And long for my caress upon your face,
The rain will touch instead-- So kiss the rain
Whenever you have tho'ts of this sad parting
And salty tears your lovely cheeks do stain
To feel the tears for you I'll surely have
Do this, and I will too-- Go kiss the rain
Whenever you are longing for my presence
And times that we went strolling down the lane
I'll whisper soft endearments on the breeze
So heed the sighing wind-- And kiss the rain
If ever you should pine to hear me speaking
The thunder might burst forth with glorious main*
While drops that fall are sure to be my tears,
To feel them wet your skin-- Just kiss the rain
* Power or Force
Copyright © 2015 Isaiah Zerbst
Comments (5)
Good poetry and nice capture.
A wonderful shot of the raindrops on the grass. Fits well with the song.
a good shot of grass in the rain, it looks so lacy.
Fantastic view and shot my friend !!!
Water is life. Great shot of the wet grass after the rain.