APRES MOI LE DELUGE (Part 8) by neiwil
Open full image in new tab Members remain the original copyright holder in all their materials here at Renderosity. Use of any of their material inconsistent with the terms and conditions set forth is prohibited and is considered an infringement of the copyrights of the respective holders unless specially stated otherwise.
No AI - This artwork was created entirely by hand or with traditional digital tools.
Description
Operation ‘CHASTISE’
Mission Brief
More than any other mission this would be a team effort, every member of the crew had a job to do….
The Rear Gunner.. On constant lookout for enemy aircraft and firing at enemy flak positions when in range
The Wireless Operator.. Would switch on the belt drive to spin the mine, once mine is successfully released, fires a red flare to prepare the next plane for it’s ‘run’.
The Navigator.. Looking out of the cockpit blister at the spotlights and calling height adjustments to the pilot.
The Flight Engineer.. Hands on throttles controlling speed during attack.
Pilot.. Keeping the plane steady and adjusting height according to Navigators instructions.
Bomb Aimer.. Lining up the target and releasing the mine at the optimum point.
Front Gunner.. Firing at dam defences as soon as in range to ‘keep their heads down’.
Due to the scattered positions of the crew and the noise inside the aircraft, internal radio communications would be vital for a successful mission.
The mission would be flown by 19 Lancasters in 3 waves
The first wave, 9 aircraft led by Guy Gibson, and including his deputy Hopgood and both Flight Leaders. They would depart in 3 groups of 3 and would attack the Mohne Dam, 25 miles West of Dortmund. If this was breached with mines to spare, they would fly to the Eder Dam, 50 miles deeper inside Germany. These were curved, masonry ‘gravity’ Dams, at 450 yards distance and 60 feet altitude, the Upkeep mine would be spun backwards prior to release. It would then ‘skip’ across the water and on contact with the Dam wall, roll down the inclined wall to a depth of 30 feet were the barometric fuse would detonate. Barnes Wallis calculated it would take only 1 mine in contact with the dam wall to cause a breach.
The second wave, 5 aircraft led by Flt Lt Joe McCarthy, ( due to a longer,more Northerly route to target, the second wave would actually depart before the first wave.) they would attack the Sorpe Dam, 6 miles Southwest of the Mohne. This was an undefended target, a straight concrete core with earthwork banks on either side. This would require the aircraft to fly along the dam and drop the Upkeep, without spinning it, as near the centre as possible. These Upkeeps were fused to explode at a depth of 25 feet, the idea being 5 concentrated strikes to blow the top off the dam rather than cause a breach.
The third wave of 5 aircraft, would depart individually starting 2 hrs after the first and second waves. They would be diverted on route to a target as and if required.
Three additional dams, the Ennepe, Bever and Lister were also briefed as possible secondary targets, although these were of far lower capacity than the primary targets.
With a few more details covered, the briefing wound up and crews retired to the mess to while away the last couple of hours.
At 21:00 hrs Flt Lt Hutchison fired a red very light into the darkening sky, this was the pre-arranged signal for the first and second wave aircraft to start their engines.....
OPERATION 'CHASTISE' WAS UNDERWAY.............
As McCarthy, Wave 2 Leader, started his engines, Glycol coolant poured from the starboard outter Merlin.This aircraft was going nowhere! he ordered his crew to grab their gear and get to the 'spare',fearing another plane may have problems and beat them to it.With the clock ticking, there was no time to wait and the other planes began to roll, with Flt Lt Bob Barlow now leading in ED-927 / AJ-E getting airborne at 21:28, followed by Les Munro in ED921 / AJ - W at 21:29, Vernon Byers in ED934 / AJ - K at 21:30 and Geoff Rice in ED936 / AJ - H at 21:31. Gibson now prepared to lead the First Wave off........

Comments (15)
Brilliant pic,
Wonderfuel tale mate, didn't actually know this was the Operational name either, so you are definately educating the masses! Thought the "Spare" aircraft might have to be used, usually the way - maybe they need another? Gotta wait til the next installment I guess to find out eh Skipper, oh well better get strapped into Tailend Charlie, only been flying for 72 hours but am way past my "due date" - cheery soul ain't I - LOL
Well its underway, can't wait to find out how it goes. Great work Neiwil!!
marevlous work!
Brilliant mate! Such incredible detail to go with picture! I cannot wait for the next one/s! Possibly your best series yet? Or is it? More to come? lol Great stuff... Rob
The sports car is a nice touch too!
Better by a dam(n) site!!!! ;)
Good stuff. Most interesting.
Great series.
What a nerve wracking experience for the crews, things going wrong at the last moment and everything else. I'm looking forward to seeing how you portray the breach of the Dams. The 1954 film had a very odd special effect if memory serves me right.
Fantastic job, both text and image. The glycol spouting Merlin I didn't know about. Just WHY...WHAT went wrong there? Everyone knew this was SO important and secret, so why? Who messed up? Good writing - building up the suspense. And, giving the details for each crew member's responsibilities. Not many know of such things. The 3 planes look like huge birds of prey ready to go. Nice job with the darkness and the red flare. I can really feel the atmosphere. Keep up the good work! This is history telling at its best - text and image. :-)
Well Done Neil! As Murphy once stated anything that can go wrong will go wrong, hence the reason behind the backup plane, marvelous story telling & the drama is rising to a crescendo. Can't wait for the next installment.
I would like to have had the picture a bit less dark, as I could make out very few details. Gripping read as always.
Great text
Excellent mate, just dam excellent.