Zero-X - This is Assembly Control by preeder
Open full image in new tab Members remain the original copyright holder in all their materials here at Renderosity. Use of any of their material inconsistent with the terms and conditions set forth is prohibited and is considered an infringement of the copyrights of the respective holders unless specially stated otherwise.
No AI - This artwork was created entirely by hand or with traditional digital tools.
Description
With Phase One of the Zero-X assembly sequence complete, the next phase can now commence. In the Briefing Room of the Assembly Control building the Controller discusses the upcomming mission with Captain Paul Travers, Space Captain Greg Martin, Space Navigator Brad Newman, Dr Tony Grant and Dr Ray Pierce the five members of the Zero-X crew.
In the picture you can see the Assembly Control building and get your first look at the Martian Excursion Vehicle (M.E.V. or MEV), the heart of the Zero-X spacecraft. Also shown is the air cushion system (the black bit) which will be used to convey the M.E.V. to its position at the front of the Zero-X Main Body where it will lock-on to the craft just prior to take-off.

Comments (5)
great scene with excellent model*****
I want to get out a BIG Lego set and build this...... Very good render, keeping true to the design ethics of the Anderson production office. Kind of "earnest but naive."
Great story! I am not familiar with the Anderson production office. But I understand I will be educated! :)
Interesting story. I'm hooked.
Great modelingwork and story my friend, excellent done.